After some thinking and after looking at what was left of the old station area after the recent rain we've had, I've changed the trackplan for the line to give a firmer base to run trains on while still retaining the option to run up the garden at a later date. The line now takes a L shape from a small pair of sidings curving around past a short siding onto the old mainline down the side of the house.
Since the photographs were taken, tracklaying was completed this evening and should be ready for a big steam up tomorrow featuring Leader and Premier on more test runs.
UPDATE:-
Just a quick shot of the new sidings which were installed late last year. Hopefully the current layout should be able to keep going for some time to come.
Cheers,
Jon
Sunday, 14 December 2014
Saturday, 6 December 2014
Premier arrives!
After returning from a running day as part of the local 16mm Association group, I was pleased to see that No.2 Premier had arrived while I was out. After some basic work, the engine is now ready for service such as regauging, fitting the dumb buffers I use and the addition of Vacumn Pipes. The only remaining thing on my todo list is to remove the preivous owner's lettering on the saddle tank after which new nameplates which are on order from Narrow Planet will be fitted when they arrive with me.
'Premier' before the fitting of Vacumn Pipes
The two sisters 'Premier' and 'Leader' now side by side for the first time
Until next time when hopefully Premier will have seen some use either on my line or at another 16mm association open day.
Cheers,
Jon
Sunday, 30 November 2014
Leader has a sister!
After some major saving and finding another suitable engine, I'm pleased to reveal what will be Steam Engine No.2.
No.2 is a second Accucraft Leader which will become 'Premier'. In real life, Premier and Leader are both sister engines of the Brazil class ordered as in 1905 for the Sittingbourne Paper Mills. Ironically, In real life the numbers were the other way round with 'Premier' being No.1 and 'Leader' being No.2. My 'Premier' has been sourced from a online forum and is arriving in Apple Green carrying the last owner's railway Livery which will be removed and repainted into a basic form of the Sittingbourne livery which the prototype engine carried before dismantling for its current overhaul began. Nameplates are now on order for both engines from Narrow Planet (who come highly recommended from myself but then I'm biased (I work for them from time to time)).
Until next time,
Jon
Photo from the SKLR website
No.2 is a second Accucraft Leader which will become 'Premier'. In real life, Premier and Leader are both sister engines of the Brazil class ordered as in 1905 for the Sittingbourne Paper Mills. Ironically, In real life the numbers were the other way round with 'Premier' being No.1 and 'Leader' being No.2. My 'Premier' has been sourced from a online forum and is arriving in Apple Green carrying the last owner's railway Livery which will be removed and repainted into a basic form of the Sittingbourne livery which the prototype engine carried before dismantling for its current overhaul began. Nameplates are now on order for both engines from Narrow Planet (who come highly recommended from myself but then I'm biased (I work for them from time to time)).
As such, the numbers for the rest of the fleet have all moved up one place to fit Premier into the sequence but I'm sure it will all be worth it in the end.
Until next time,
Jon
Sunday, 16 November 2014
Running at Parbrook
After the disaster of Jessie derailing last time at Parbrook, I decided to take Leader along this time to run with the full Welshpool and Llanfair Railway Set. Its safe to say it went down very well with lots of comments on the set as a whole along with the power of Leader working the train. At one point, another of the gents that turned up was going to run his Arkangel T&D with the wagons but it didn't have the power to do it despite being a much bigger engine! Although the fact that the engine in turn was about 4-5 times older than Leader might have had something to do with it.
Cheers,
Jon
Cheers,
Jon
Engines Come, Engines go
After some thought, I've put Loco No.3 the MSS tender engine for sale on Ebay. I've just grown fed up of it and along with the fact it hasn't run since Late May and has never met expectations since it was brought. However, with the pending departure of No.3, there is a new engine now on order to replace it.
Now on order from the same supplier of 'Leader', is a new Accucraft Ragleth in Green. It should go well with Leader and with the Accucraft stock that I prefer to use. Also its reputed to have plenty of power which is great for the longer trains that I tend to run at steam ups with the local 16mm association area group. It is intended that the new engine will become the new No.2 on arrival with Jessie taking No.3 .
It should be a great little engine when it arrives later this year or early next year.
Cheers,
Jon
Saturday, 18 October 2014
Diesels on Parade
After a relatively successful visit to a local 16mm Area group steam up, both my IPE battery electrics were running with the shortened Passenger set for test running at home/with the Battery electrics. Both engines were running well with both engines managing the full length set. However, the day didn't pass without incident. During a gust of wind, small twigs were blown onto the track and before the line could be cleared/train stopped, Jessie hit one of them derailing and pulling the whole train off the track and onto the concrete below. The passenger stock was relatively undamaged but Jessie, now with a new working gearbox, was another matter. On contact with the ground, the battery pack was sent flying out from under the bonnet along with detailing falling off and the coupling pins/chains being sent flying in all directions. On the upside, the gearbox survived as did the rest of the engine. The damaged internal electrics have been fixed with the detailing being glued back into place so the engine should be back in traffic shortly with some minor cosmetic work being required before a full return into service.
Cheers,
Jon
Monday, 13 October 2014
Time for a update - No.4 has arrived
Afternoon all,
After some recent saving up, I've been able to buy a new engine from Anything Narrow Gauge. Admitically, based on its close relative, I would have normally avoided this type of engine but after seeing the seller and knowing it was a good runner, I decided to just go for it.
No 4, is a IP Engineering Jessica.
Jessica is a 0-6-0 and was the largest out of the 3 IPE J class Battery Electrics. The other two designs were Jessie (Our No.2) and Jack (another 0-6-0). Like Jessie, Jessica uses 6 AA batteries and manual controls to set speed and direction. Jessica's relative success in operation unlike Jessie is in part down to its whitemetal gearbox. Jessie had one of them when brought originally but shortly after arrival, the gearbox split and had to be replaced with a plastic replacement. The only planned modification I have for Jessica is the fitting of identical vacumn pipes to Jessie then it will be ready for entry into full service.
Already, Jessica is showing its higher power output than Jessie on testing being able to manage the full 3 coach IoM passenger set unlike the single coach Jessie can manage. However, due to the changed arrangement at the ends of the line, trains won't exceed 2 coaches and a van which is safety within the capilbilities of Jessica and potenially Jessie now its fitted with its new gearbox. With the success of Jessica, I'm now on the look out for its sister design 'Jack' which is also a IP Engineering 0-6-0. However, Jack along with Jessica don't appear very often second hand so it may be a case of being lucky.
Until next time,
Jon
Subscribe to:
Posts (Atom)

