Basic testing has begun with Leader and a new arrival so I'm happy with the current results. Since all that the line will be used for will be test running along with the occasional steamup when I'm bored.
The revised Station layout before the missing section of SM32 was added. The G45 on the right is to give me somewhere to run my LGB when the mood takes me that direction.
The Station in raining mode with the new steamup bay clearly showable between the bins and the fence
The Single running line between Broadstone and the outer station limits of 'End O Line'.
Hopefully I'm going to be able to purchase the rest of the wood for the remaining track bed plus the extra point for the sheds then the railway should be complete in this form.
Cheers,
Jon
No comments:
Post a Comment